Tag Archives: Tower Cranes Built

How are Tower Cranes Built

A Tower Crane Mast Section is set into a foundation with steel pedestals. The Mast Section is is plumbed to a degree of 1:500 (ie It must not deviate more than 1 inch from plumb for every 500 inches vertical) … Continue reading

Posted in English Crane News | Tagged | Leave a comment